[ad_1]
Padma Bridge from satellite tv for pc. Picture: Screengrab
“>
Padma Bridge from satellite tv for pc. Picture: Screengrab
Photos of Padma Bridge atop the river Padma have been captured by Zoom Earth from the satellite tv for pc.
Connecting Munshiganj’s Mawa and Shariatpur’s Jazira on each ends, the infrastructure stands because the longest bridge within the nation.
Satellite tv for pc picture captured Saturday (25 June) reveals the curved bridge taking on about 2.5 sq. km of space over the waterbody. The precise size of the bridge is 6.15km.
The bridge can be seen on Google Maps.
Prime Minister Sheikh Hasina inaugurated the bridge earlier within the day.
The Padma Bridge venture has been carried out at a value of Tk30,193.39 crore with nearly 100% inside funding which is believed to deliver a brand new world to the nation’s economic system by connecting 21 southwestern districts by means of roads and railways with the capital.
Beginning in 1999 with a pre-feasibility examine, building of the bridge, which has since generated quite a few headlines, has had its share of delays and even courted controversy.
The development of the principle bridge was carried out by China Main Bridge Engineering Firm (MBEC), a Chinese language contractor Firm, and the river therapy was accomplished by Sino Hydro Company of China.
The development works started in December, 2015 because the premier inaugurated the river coaching work and most important building works of Padma Multipurpose Bridge venture at Jajira level in Shariatpur district on 12 December in 2015. The primary span of the Padma Bridge was put in on the Janjira level of Shariatpur on 7 October, 2017.
The prime minister formally laid the muse stone of Padma Bridge at Mawa in Munshiganj on 4 July in 2001. The development of the bridge was supposed to begin in 2015, however the cancellation of international help for it and an growing depth of the river, amongst different problems, delayed the work.
[ad_2]
Source link